Test Commissioning Panel LVMDP (Low Voltage Main Distribution Panel) pada Bangunan Masjid Negara Ibu Kota Nusantara
DOI:
https://doi.org/10.62007/joumi.v4i3.964Keywords:
Building Automation System, Electrical Power Continuity, Low Voltage Main Distribution Panel, Smart Building, Testing and CommissioningAbstract
Masjid Negara in Nusantara Capital City (IKN) is a national strategic infrastructure designed as a Smart Building (Bangunan Gedung Cerdas / BGC), demanding high operational reliability and electrical power continuity. This engineering work aims to analyze and verify the physical, technical, and operational feasibility, digital communication integration, testing findings classification, HSE management effectiveness, engineering code of ethics compliance, and budget allocation for a 2500 A Low Voltage Main Distribution Panel (LVMDP) interconnecting the main PLN grid and a 1250 kVA Emergency Backup Generator Set. The methodology included non-energized testing of busbar insulation resistance, bolt torque verification, and grounding resistance, followed by energized testing of voltage stability, phase sequence, ATS automation simulation, and Modbus RS-485 data transmission integration into the Building Automation System (BAS). All execution stages prioritized public safety, technical integrity, professionalism, and compliance with the Construction Safety Management System (SMKK) under PUPR Ministerial Regulation No. 10/2021, achieving zero accidents. Test results confirmed busbar insulation resistance ≥1 MΩ, grounding resistance ≤2 Ω, and bolt torque compliance with mechanical specifications. No critical findings were identified, while major and minor findings were rectified. Automatic transfer times complied with NFPA 110 standards. DPM integration into BAS via Modbus RS-485 successfully provided accurate real-time electrical telemetry. Based on testing and commissioning cost analysis, the LVMDP 2500 A is declared fit for operation and compliant with PUIL 2020, IEC 61439, and PUPR Ministerial Regulation No. 21/2021.
References
[1] O. S. E. Atwa, “Introduction to Testing and Commissioning of Power System,” in Practical Power System and Protective Relays Commissioning, Elsevier, 2019, pp. 23–30. doi: 10.1016/b978-0-12-816858-5.00003-4.
[2] InterNational Electrical Testing Association, “ANSI/NETA ATS-2021: Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems,” 2021.
[3] Modbusorg, “MODBUS Application Protocol 1 1 b,” 2012. [Online]. Available: http://www.modbus.org
[4] Badan Standardisasi Nasional, “Persyaratan Umum Instalasi Listrik 2020 (PUIL 2020), SNI 0225:2020,” 2020. [Online]. Available: www.bsn.go.id
[5] Badan Standardisasi Nasional, “SNI 0225:2011 / PUIL 2011: Persyaratan Umum Instalasi Listrik,” 2011.
[6] International Electrotechnical Commission, IEC 61439-1:2020 Low-voltage switchgear and controlgear assemblies - Part 1: General rules. 2020. [Online]. Available: www.iec.ch
[7] National Fire Protection Association, “NFPA 110: Standard for Emergency and Standby Power Systems,” 2022.
[8] Kementerian Pekerjaan Umum dan Perumahan Rakyat, “Permen PUPR No. 21 Tahun 2021 tentang Pedoman Penyelenggaraan Bangunan Gedung Hijau dan Cerdas,” Jakarta: KemenPUPR, 2021.
[9] T. Books Coordinating Committee of the IEEE Industry Applications Society, “IEEE Std 3007.3-2012, IEEE Recommended Practice for Electrical Safety in Industrial and Commercial Power Systems.”
[10] Deutsches Institut für Normung, “DIN 43671: Copper busbars; design for continuous current,” Berlin, Germany: Beuth Verlag.
[11] A. Mu, “PERENCANAAN SISTEM DISTRIBUSI LISTRIK PELAKSANAAN PROYEK APARTEMEN.”
[12] KemenPUPR, “Permen PUPR No. 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi (SMKK),” 2021, Accessed: Aug. 03, 2026. [Online]. Available: https://jdih.pu.go.id/detail-dokumen/PermenPUPR-nomor-10-tahun-2021-Pedoman-Sistem-Manajemen-Keselamatan-Konstruksi
[13] International Organization for Standardization and International Electrotechnical Commission, “General requirements for the competence of testing and calibration laboratories, ISO/IEC 17025:2017,” 2017. [Online]. Available: www.iso.org
[14] National Fire Protection Association, “Standard for Electrical Safety in the Workplace, NFPA 70E,” 2024. [Online]. Available: www.nfpa.org.
[15] Occupational Safety and Health Administration, “Job Hazard Analysis, OSHA Publication 3071,” 2002.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Dikyi Alvian, Dimas Anton Asfani, Agus Setiono

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.